Showing posts with label #TfB. Show all posts
Showing posts with label #TfB. Show all posts

Thursday, 14 May 2020

The challenges of winter for TfB

Covid-19 has been a trying time for the country, especially for those on the front line such as health care staff and emergency services. Transport for Buckinghamshire (TfB) has been continuing to maintain the roads network across Buckinghamshire to ensure they are as safe as possible, so our emergency workers can travel to where they are needed most.

 

As well as our wonderful NHS, there are a number of workers around the county keeping public services running and TfB is extremely proud of its operational colleagues, who are still out there trying to keep things running smoothly.

 

Due to this commitment to service, the local road networks remain open and as a result, essential workers can travel and deliveries can be made to the vulnerable.

 

Whilst traffic volumes around Buckinghamshire are at an all-time low, TfB can get ahead of the game with much needed repair works on main traffic routes without causing major disruption. Our primary focus is to continue to keep roads in Buckinghamshire safe, particularly for emergency services, key workers and distribution of essential supplies. Safety for both our staff and the public is of the utmost importance. Social distancing and hygiene standards will be observed in accordance with government guidance whilst balancing the need for any safety defects to be repaired in the correct manner.

 

In the first few weeks we carried out repairs of the most safety critical defects, and assessed our planned programme of more extensive improvements in the light of many unknowns including likely availability of workers, materials, equipment. We have also been working with utility companies to see what changes need to be made, if any.

 

We are now actively progressing a wide range of road improvements, and even bringing some forward while the network is much quieter than normal. This is on the basis that ongoing road improvements are necessary to stop deterioration of the highway in the future, in line with current government guidelines, and the road network needs to be fit for purpose for when the lock-down ends as well as keeping essential workers moving safely now.

 

All of this has been going on as we have headed out of the winter service delivery period, which runs between from October until April. So what did we do over the winter period?

 

Winter usually throws an array of challenges at Transport for Buckinghamshire (TfB)! Most people associate winter with short days and cold weather, but it was storm Ciara and Dennis and the associated, almost relentless heavy rainfall, that reminds us that these can have just as great an impact on the travelling public.  Whatever the conditions, the TfB operational delivery team, strives to keep the highway safe.

 

In preparation for the 2019/20 winter, over 10,000 tonnes of salt were stocked in the depots for the fleet of 25 spreading vehicles, which operate from the four area bases.

 

The first two runs of the gritting season began on 27th October, which was very similar to the previous year. As the winter progressed, it became colder than last year, and with wet roads, increasing the risk of slippery surfaces, increased gritting was required. By the end of December, 25 runs were carried out - an increase of 9 on the previous year. Even Christmas night was a frosty one, so TfB gritter drivers were out gritting roads before people embarked on their Boxing Day journeys.

 

On a daily basis throughout the winter, TfB routinely monitors road surface temperatures gritting season in order to plan each day. It’s the road surface temperature (RST) that is important, so if there is a forecast of the RST dropping below +0.5°C and ice likely, the crews are alerted and gritters get ready to begin their routes.

 

The winter period began on 27th October and ended on the 19th April, with a total of 60 gritting runs completed.

 

 

December and January also saw a huge amount of rainfall. In normal seasonal weather, two gully emptying machines are permanently on the TfB contract, delivering the cyclical gully clearing programme each year.

 

During the period of extreme rainfall, it was a challenge to keep on top of the significant additional reactive work of clearing flooding sites.  Two additional machines were purchased in order to support the depots in the North and South of the County.

 

With constantly saturated roads and floodwater on the carriageway, there was a rapid deterioration of large areas of road surface, with the teams reacting to an influx of pothole reports on a daily basis.

 

In early February, two severe storms hit the County. When storm Ciara hit, the standby crews responded to over 150 tree related issues, ranging from branches to entire trees fallen across the carriageways. Work for the TfB gangs and supply chain partners included closing roads, clearing debris and attending to flash floods after very heavy isolated rain periods.

 

Just a week later storm Dennis prompted another 150 related callouts to approximately 30 trees with the remainder of the calls being flooding issues.  Many fields became saturated, with large amounts of run-off reaching the road network, leaving the road drainage system unable to cope.

 

So, in all elements, the winter period was non-stop for the operational and extended support teams at TfB who are on call 24 hours a day.

 

Transport Cabinet Member, Nick Naylor, said:

 

“I am incredibly proud of the hard work demonstrated by our winter crews at TfB. Without them, travelling around the County would, at times, be near impossible. Their work is invaluable, with many team members sacrificing Christmas celebrations and festivities to keep the network moving. I know I am not alone when I say that we really appreciate all that the teams do. Thank you!”

 

TfB aims to keep the travelling public updated with news regarding road closures, gritting updates and general roadworks via social media so, please follow TfB twitter @tfbalerts or the Facebook page, Transport for Bucks.

 

 

 

 

Monday, 22 July 2019

Give us your views on roads!


Give us your views on roads! 

Buckinghamshire County Council (BCC) seeks to listen to the views of its residents and, each year, takes part in the National Highways and Transportation (NHT) survey. This survey is sent to 3,300 householders in Buckinghamshire during June.

This year, BCC is giving residents the opportunity to respond to its own additional online transport survey. This will be taking a deeper look at two of the key NHT questions about ‘Road Condition’ and ‘Road Congestion’. The opinions collected through this survey, will assist BCC with its strategic planning function.







Deputy Leader and Cabinet Member for Transportation, Mark Shaw said, “when we look at the combined results of these two surveys, we can really start to build a picture of how the public views and rates our services. This will assist both Buckinghamshire County Council with transport planning and Transport for Buckinghamshire - the strategic highway maintenance arm of the organisation – with advising us on where the roads budget is best spent each year. We really value the views of our residents, and this additional questionnaire will give us a better understanding of any issues respondents are experiencing with road condition and road congestion.”

The survey will remain open to the residents of Buckinghamshire until 30th September 2019. It takes under 5 minutes to complete and is open to all residents even if they have responded to the initial NHT survey received last month. The results will be made available on the BCC website, in the autumn this year.


https://www.surveymonkey.co.uk/r/BCCtransportsurvey2019 



Thursday, 20 June 2019

Why aren't you cutting the grass properly?

Ask the Contract Director!

We understand that as members of the public, you probably have a lot of burning questions regarding the roads around Buckinghamshire. Well, we're giving you the opportunity to get your questions answered by Transport for Buckinghamshire's Contract Director!

This is the 11th blog post that we have produced focusing on the questions that you have been asking the most, this week we are looking at:


Why aren't you cutting the grass properly?

Grass cutting takes place between April and October depending on the weather and each cut takes between seven and eight weeks to complete. 

Every year, we carry out four urban grass cuts across the county. In some urban areas, responsibility has been passed to the local Town or Parish Council through devolved services.

A lot of you have expressed some dissatisfaction with a number of aspects of our grass cutting this year, so we would like to address those concerns now:


The grass cutting is behind schedule!

We did start our grass cutting in the Aylesbury Vale one week late due to equipment issues. Since then, we have lost approximately five days due to poor weather conditions and issues with equipment. As it currently stands, we have completed the first cut and already begun the second cut. 

As we are approximately two weeks behind in the North of the county, we are working at the weekends in an attempt to catch up. By the time we get to the third cut, we will be back on track with the programme. 

In the High Wycombe area, the grass cutting programme is also approximately two weeks behind. 

In South Bucks and Chiltern areas of the county, we are approximately four weeks behind and are just completing cut one. 


You're not strimming after cutting the grass and then you're leaving the cut grass behind!

All strimming around street furniture is completed in conjunction with mowing. However, as the grass has not been cut since last October it can be incredibly long and doesn't always drop once strimmed, giving the impression that it hasn't been cut. 

We have not collected the clippings for many years as to do so adds a large cost to the operation. There are also issues with appropriate disposal of them. Our teams do blow the loose grass cuttings back onto the verge. However, this does mean the loose grass can sometimes make the area look like it hasn't been cut or strimmed. Unfortunately, if the conditions are windy then the grass can blow back onto the footpath or road. 











You've missed my area!

Because of the amount of rain we have had at the moment, the grass has had ideal growing conditions and as a consequence of this, is growing very quickly. This means that sites that have received their first cut early on in the programme may appear as though they have been missed from the programme.


Can I cut the verge outside my house?

In much the same way as we encourage residents to clear the footpaths in the winter if we have snow, there are very few good reasons to prevent a resident living in an urban area with a 30mph speed limit from cutting the verge outside of their property. If you want to cut the grass then:

- Use a petrol mower if possible, if not then make sure your electric mower has a protected plug or is connected to a protected socket

- Make sure there are no big stones that could flick up and break windows, damage cars or hurt yourself or a passing pedestrian

- Stop mowing when somebody comes close

- If you want to collect the clippings then dispose of them responsibly. Leave the last cuts clippings in place, this will help to replenish the soils nutrients. 

The people driving the vehicles are speeding

Our teams are trained to use the equipment that we use and are aware that speeding does cause issues with the quality of the cut produced. 

All of our vehicles are tracked and the speed is monitored. 


You've neglected Iver!

Iver is receiving grass cuts just as often as anywhere else in the county. In fact, Iver was one of the first parishes to be cut in the South of the county! 




Follow us on Twitter | Like us on Facebook

Friday, 25 January 2019

Why are there roadworks and/or temporary signals in place but no one working on site? - Ask the Contract Director! #1


We understand that as members of the public, you probably have a lot of burning questions regarding the roads around Buckinghamshire. Well, we’re giving you the opportunity to get your questions answered by Transport for Buckinghamshire’s Contract Director!

In each blog post in this exciting new series, we will be focusing on a different frequently asked question. This week, we’re answering:


Why are there roadworks and/or temporary signals in place but no one working on site?



We often hear about your frustrations across Facebook and Twitter, and one that crops up more often than others is when you find yourself held at temporary signals or when you drive past a site where work should be happening, but you can’t see anyone working there. It can be annoying, particularly if this site has meant you’ve been delayed or had to use a diversion route. However there are a few reasons why you might not see anyone on site.

There are many organisations working on the network and if the work is not being carried out by us, we will investigate it.


Waiting for materials
Sometimes operatives are waiting for materials to be delivered, which is why you might see them sitting in their van or standing around the site. It may look like they’re ‘not working’, but the reality is they just can’t yet!


The work is being completed by different teams and contractors
Many works are completed in different phases, with each phase being carried out by a different team or specialist contractor. Sometimes, a site may be left unoccupied after one section of work is complete and the relevant team leaves and the next team haven’t arrived.


Testing of water mains
If new pipes have been installed on a site, the water mains needs to be tested. This means you might not see any physical work going on at the site, but it doesn’t mean work isn’t happening.


There is an excavation
If there is an open excavation on the site, equipment needs to be left up even if nobody is working there that day, to keep the public safe.






There’s been a gas leak
If there has been a gas leak, venting needs to take place to disperse the build-up of gas deposits, which means you won’t see anyone actively working on the site.


Noise implications
Sometimes work can’t be done during certain hours (usually at night) because of the environmental noise implications.  Similarly, sometimes works are planned for set times of the day, which means you won’t always see work going on.
The site won’t be packed up out of hours, which means sometimes you’ll drive past an empty site.


Weather conditions
A lot of our work is weather dependent and if we are working there one day, the weather may prevent us from working there the next. The site wouldn’t be taken down, it would just be left there until the weather had improved, and so you may see an empty site with traffic signals.


Waiting time is needed!
Tarmac or concrete reinstatement takes time to cure, and no work can be carried out on site whilst this is happening.


A lunch break!
Yes, even TfB operatives get lunch breaks! If you see them sat around eating, it isn’t because they’re choosing not to work – they could simply be on a lunch break!



There is more to a work site and/or temporary signals than you might think – a lot of work goes on behind the scenes that you don’t necessarily see. Next time you see an empty site and feel angry that no one is working but your route has been interrupted, remind yourself of the reasons above. Sites aren’t left empty unnecessarily – there is always a reason.


Follow us on Twitter | Like us on Facebook