Monday, 26 April 2021

Frequently asked questions about...gullies!

Following the February budget announcement that an injection of £4 million funding would boost Transport for Buckinghamshire's (TfB) gully clearance programme, work will begin from 4th May 2021. This additional investment will enable each of the 80,000 gullies on the road network to be cleared.

Ahead of the programme beginning, we've answered some of your most frequently asked questions about gullies and the gully clearing programme... 


What is a gully?

A road gully is a small pot placed along the edge of the road and covered from the top by gully grating, which is made of a steel frame. The main purpose of a gully is to collect surface water off the road and direct it to an existing drainage network, which includes a ditch system, a large soakaway or a water course.


What is a soakaway?

A soakaway is a drainage pit covered by a metal cover which many road gullies feed into. Its purpose is to allow Highway water coming into a gully to feed into this soakaway and drain naturally into the surrounding subsoil. They can get blocked with silt, and in times of high water tables (e.g. excessive rainfall and flooding), they will take a lot longer to drain away. This leaves gullies looking full due to the soakaway being backed up with no water penetrating the subsoil surrounding the area.

 

What is a grip and why do they need re-cutting?

A grip is a channel cut within a grass verge to allow running and pooling water from rural road surfaces into a parallel drainage ditch that normally runs alongside the road. Rural roads with no man-made gully drainage systems benefit from grips being cut. However, in recent years we have seen a rise in verge overruns by cars and vehicles blocking grips and stopping running water entering the ditch systems. It is important to maintain grips to ensure they are kept open and free of damage or grass growth to allow water to exit the highway and soak into the ditch systems.

 

How often will you clean a gully?

From the start of this new financial year we have started cleansing all gullies on an annual basis. Previously, we cleaned gullies on A and B roads on a cyclical basis and all other gullies were cleaned once every three years. In addition to this, we will also be cleaning out soakaways and ditches, which is something we have been unable to do routinely before due to budget constraints.

 

How many gully cleaning machines do you have?

We have three gully cleaning machines in house, once located at each area depot – Aylesbury, Wycombe and Amersham. However, this year we have also hired an additional four machines with operators, from our supply chain partners, which means a total of seven machines will be working across the contract.

 

When does your gully cleaning programme start?

Our new gully cleaning programme commences from 4th May 2021 with the cyclic programme and will continue until 31st March 2022.

 

How long can you spend on a stuck gully?

Sometimes, our crews come across a gully cover that is stuck, which means we can’t access it to clean it. Our crews do carry tools with them that can help in this situation, but they cannot spend longer than ten minutes trying to get access to a gully. If we cannot get access, we will record it on our system and return to release it.


Like us on Facebook | Follow us on Twitter

Wednesday, 21 April 2021

Think, keep calm and just turn back

Think, keep calm and just turn back. A slogan we coined in 2019 as part of our new 'Respect our Workforce' campaign, designed to eliminate abuse directed at our customer facing team members.

Sadly, abuse towards our workforce is still an issue that we have to deal with on a very regular basis.

Our staff are sworn and shouted at, spat at, have rubbish thrown at them, are physically assaulted and have even been threatened with weapons. All too often, members of the public are even driving through road closures because they don't want to use the diversion route, putting our crews lives - and their own lives - at risk. 

Our staff are regularly facing abuse simply for doing their jobs. It's got to stop. 

We have taken the necessary action our end. We use bodycams. We have signs up advising of the use of CCTV on site and asking the travelling public to respect our workforce. We ask for our workers to be respected via social media. Ideally, we wouldn't even have to ask, but the reality of the situation is that it's still necessary to. 




Everyone deserves to feel safe at work. Everyone deserves to return home in one piece at the end of the day. 

Our team members; they're more than just that. They are mums and dads, brothers and sisters, friends. They have families to go home to safely at the end of the day. That is the bare minimum you expect when you go to work. It's something that everyone deserves, our workforce included.

We understand that our work and the work of our utility companies and supply chain partners can be frustrating for you, the travelling public. Closed roads and temporary traffic lights can add time to your already long day and stopping at a site where you can't see work happening can be the last straw on a bad day. 

We are the travelling public too. We get it. But it's still never an excuse to abuse our workforce.

That is why we are asking once again, that people think, keep calm and just turn back. 

Our workforce are here to do a job. They are here to look after our roads and make sure they're safe for you to travel on. Issues on the road are not the fault of our workforce, so please do not take out any frustrations you may have on them. 

It doesn't stop with the customer facing workforce, either. If you're speaking to someone on the phone, through email or via social media, please still remember to respect our workforce and treat them as you yourself would want to be treated. Swearing, threats and name calling are all unnecessary - and yet our workforce still deal with this on an all too regular basis. 

To ease your frustrations, it can help to plan ahead. Make sure you're checking your route on one.network, a satnav or other route checkers online ahead of any journey's you make, as this will advise you of closures, diversions and delays. 

If you spot a defect, report it on Fix My Street where it can be allocated to the appropriate team - please don't make an abusive phone call to us about it. 

We know that roadworks cause frustrations at the best of times, but no one ever deserves to be abused simply for doing their job. 

We will bring the abuse of our workforce to an end. 

Please think, keep calm and just turn back. 


Like us on Facebook | Follow us on Twitter

Wednesday, 28 October 2020

Transport for Buckinghamshire is Preparing for Winter

The end of this year is looking rather different than we are used to, however Transport for Buckinghamshire’s (TfB) winter plan is still very much the same, to keep Buckinghamshire’s highways safe, no matter the conditions.

 

Buckinghamshire has over 3,000km of road network and not all of it will be gritted during the winter season, as limited resources available to TfB requires them to focus the service on 25 pre-selected priority routes that are required to keep the general traffic moving. The depots across the county have a combined total of 10,500 tonnes of salt, this includes an emergency supply held in Saunderton.

 

The decisions on whether to send out the gritters are made daily, based on local weather forecasts and road temperatures, rather than air temperatures. The readings are provided by monitoring stations around the county, with daily weather forecasts received showing the predicted ground temperature and dew point. The dew point is the point where air has cooled to a degree that it can no longer hold moisture. If the ground temperature is forecast to drop to zero, ice would be expected to occur on untreated roads. The gritters are likely to be sent out whenever road temperatures are forecast to fall below +0.5°c and ice is expected to form. The decision is not taken lightly as each run uses approximately between 65 and 85 tonnes of rock salt.

 

As well as the technical reports being a factor in the decision making, the experience and teamwork of TfB operatives also play a big role in deciding when to send the gritters out. Once the decision has been made, an update will be provided on TfB’s twitter pages, @TwitGritter and @tfbalerts as per previous years. The fluffy animal photos posted with the updates on @tfbalerts have proved to be a big hit with the public and generally looked forward to by the followers of the page.

 

There is never any guarantee that the roads will be completely clear of ice or snow, due to several factors such as a late change in forecast, or if the teams must wait for rain to clear before gritting as it cannot be applied during wet weather due to the risk it could be washed away. In severe cold weather, salt becomes less effective, and below -8°c even salt will not prevent ice from forming.

 

The winter service is not due to start until October however gritting crews have already been out for their pre-winter training, providing re-fresher training to current staff and training new operatives. Before the gritting season starts officially, all the vehicles will be thoroughly serviced, and inspected, and the drivers will re-familiarise themselves with the machines and ensure the equipment is working correctly during the winter parade held on Saturday 5th October 2020.

 

Transport Cabinet Member, Nick Naylor, said:

 

‘I am incredibly proud of the hard work demonstrated by TfB during this strange year and even more so with their impeccable planning, ready to keep the county safe during the inevitable cold snap. Without their dedication, travelling around Bucks during those frosty winter months would be near impossible and we need to keep those roads clear for our key workers. Thank you to all at TfB.’

Thursday, 14 May 2020

The challenges of winter for TfB

Covid-19 has been a trying time for the country, especially for those on the front line such as health care staff and emergency services. Transport for Buckinghamshire (TfB) has been continuing to maintain the roads network across Buckinghamshire to ensure they are as safe as possible, so our emergency workers can travel to where they are needed most.

 

As well as our wonderful NHS, there are a number of workers around the county keeping public services running and TfB is extremely proud of its operational colleagues, who are still out there trying to keep things running smoothly.

 

Due to this commitment to service, the local road networks remain open and as a result, essential workers can travel and deliveries can be made to the vulnerable.

 

Whilst traffic volumes around Buckinghamshire are at an all-time low, TfB can get ahead of the game with much needed repair works on main traffic routes without causing major disruption. Our primary focus is to continue to keep roads in Buckinghamshire safe, particularly for emergency services, key workers and distribution of essential supplies. Safety for both our staff and the public is of the utmost importance. Social distancing and hygiene standards will be observed in accordance with government guidance whilst balancing the need for any safety defects to be repaired in the correct manner.

 

In the first few weeks we carried out repairs of the most safety critical defects, and assessed our planned programme of more extensive improvements in the light of many unknowns including likely availability of workers, materials, equipment. We have also been working with utility companies to see what changes need to be made, if any.

 

We are now actively progressing a wide range of road improvements, and even bringing some forward while the network is much quieter than normal. This is on the basis that ongoing road improvements are necessary to stop deterioration of the highway in the future, in line with current government guidelines, and the road network needs to be fit for purpose for when the lock-down ends as well as keeping essential workers moving safely now.

 

All of this has been going on as we have headed out of the winter service delivery period, which runs between from October until April. So what did we do over the winter period?

 

Winter usually throws an array of challenges at Transport for Buckinghamshire (TfB)! Most people associate winter with short days and cold weather, but it was storm Ciara and Dennis and the associated, almost relentless heavy rainfall, that reminds us that these can have just as great an impact on the travelling public.  Whatever the conditions, the TfB operational delivery team, strives to keep the highway safe.

 

In preparation for the 2019/20 winter, over 10,000 tonnes of salt were stocked in the depots for the fleet of 25 spreading vehicles, which operate from the four area bases.

 

The first two runs of the gritting season began on 27th October, which was very similar to the previous year. As the winter progressed, it became colder than last year, and with wet roads, increasing the risk of slippery surfaces, increased gritting was required. By the end of December, 25 runs were carried out - an increase of 9 on the previous year. Even Christmas night was a frosty one, so TfB gritter drivers were out gritting roads before people embarked on their Boxing Day journeys.

 

On a daily basis throughout the winter, TfB routinely monitors road surface temperatures gritting season in order to plan each day. It’s the road surface temperature (RST) that is important, so if there is a forecast of the RST dropping below +0.5°C and ice likely, the crews are alerted and gritters get ready to begin their routes.

 

The winter period began on 27th October and ended on the 19th April, with a total of 60 gritting runs completed.

 

 

December and January also saw a huge amount of rainfall. In normal seasonal weather, two gully emptying machines are permanently on the TfB contract, delivering the cyclical gully clearing programme each year.

 

During the period of extreme rainfall, it was a challenge to keep on top of the significant additional reactive work of clearing flooding sites.  Two additional machines were purchased in order to support the depots in the North and South of the County.

 

With constantly saturated roads and floodwater on the carriageway, there was a rapid deterioration of large areas of road surface, with the teams reacting to an influx of pothole reports on a daily basis.

 

In early February, two severe storms hit the County. When storm Ciara hit, the standby crews responded to over 150 tree related issues, ranging from branches to entire trees fallen across the carriageways. Work for the TfB gangs and supply chain partners included closing roads, clearing debris and attending to flash floods after very heavy isolated rain periods.

 

Just a week later storm Dennis prompted another 150 related callouts to approximately 30 trees with the remainder of the calls being flooding issues.  Many fields became saturated, with large amounts of run-off reaching the road network, leaving the road drainage system unable to cope.

 

So, in all elements, the winter period was non-stop for the operational and extended support teams at TfB who are on call 24 hours a day.

 

Transport Cabinet Member, Nick Naylor, said:

 

“I am incredibly proud of the hard work demonstrated by our winter crews at TfB. Without them, travelling around the County would, at times, be near impossible. Their work is invaluable, with many team members sacrificing Christmas celebrations and festivities to keep the network moving. I know I am not alone when I say that we really appreciate all that the teams do. Thank you!”

 

TfB aims to keep the travelling public updated with news regarding road closures, gritting updates and general roadworks via social media so, please follow TfB twitter @tfbalerts or the Facebook page, Transport for Bucks.

 

 

 

 

Wednesday, 11 September 2019

What is Surface Dressing?

Ask the Contract Director!

We understand that as members of the public, you probably have a lot of burning questions regarding the roads around Buckinghamshire. Well, we’re giving you the opportunity to get your questions answered by Transport for Buckinghamshire’s Contract Director!


This is the 12th blog post in the series. This week, we’re answering:


What is Surface Dressing?


Surface Dressing is an efficient and effective method for routine maintenance of road surfaces.

Having previously repaired any defects on the road, we spray the existing surface with a thin layer of hot bitumen binder, before spreading stone chippings over the bitumen. This is then made to stick to the existing surface using a heavy roller.

There are many benefits to carrying out Surface Dressing treatment. First of all, it forms a water resistant layer. This makes the road less slippery, and therefore more skid resistant for 7-10 years.

Using Surface Dressing also extends the life of the road, by preventing water (and, as a result of cold temperatures, ice) getting in to cause cracks, which could eventually develop into potholes.

Once we have completed the Surface Dressing, it has to be left for a week before we can return back to the site and sweep the road, removing most of the loose chippings. However, some loose chippings will remain until vehicles drive over them, pressing them into the bitumen.

Surface Dressing work is very weather dependant and so cannot be carried out if the weather is too hot or too cold.

Upon completion of Surface Dressing work, you can drive on the road, but only once all the materials have been laid. If you drive on the wet bitumen before we have spread the chippings, it will stick to your vehicle.

It is not advised to walk, or allow your pets to walk, on the new surface, even when the chippings have been laid. This is because some may stick to your shoes (and your pet’s paws!)




Like us on Facebook | Follow us on Twitter

Monday, 22 July 2019

Give us your views on roads!


Give us your views on roads! 

Buckinghamshire County Council (BCC) seeks to listen to the views of its residents and, each year, takes part in the National Highways and Transportation (NHT) survey. This survey is sent to 3,300 householders in Buckinghamshire during June.

This year, BCC is giving residents the opportunity to respond to its own additional online transport survey. This will be taking a deeper look at two of the key NHT questions about ‘Road Condition’ and ‘Road Congestion’. The opinions collected through this survey, will assist BCC with its strategic planning function.







Deputy Leader and Cabinet Member for Transportation, Mark Shaw said, “when we look at the combined results of these two surveys, we can really start to build a picture of how the public views and rates our services. This will assist both Buckinghamshire County Council with transport planning and Transport for Buckinghamshire - the strategic highway maintenance arm of the organisation – with advising us on where the roads budget is best spent each year. We really value the views of our residents, and this additional questionnaire will give us a better understanding of any issues respondents are experiencing with road condition and road congestion.”

The survey will remain open to the residents of Buckinghamshire until 30th September 2019. It takes under 5 minutes to complete and is open to all residents even if they have responded to the initial NHT survey received last month. The results will be made available on the BCC website, in the autumn this year.


https://www.surveymonkey.co.uk/r/BCCtransportsurvey2019 



Thursday, 20 June 2019

Why aren't you cutting the grass properly?

Ask the Contract Director!

We understand that as members of the public, you probably have a lot of burning questions regarding the roads around Buckinghamshire. Well, we're giving you the opportunity to get your questions answered by Transport for Buckinghamshire's Contract Director!

This is the 11th blog post that we have produced focusing on the questions that you have been asking the most, this week we are looking at:


Why aren't you cutting the grass properly?

Grass cutting takes place between April and October depending on the weather and each cut takes between seven and eight weeks to complete. 

Every year, we carry out four urban grass cuts across the county. In some urban areas, responsibility has been passed to the local Town or Parish Council through devolved services.

A lot of you have expressed some dissatisfaction with a number of aspects of our grass cutting this year, so we would like to address those concerns now:


The grass cutting is behind schedule!

We did start our grass cutting in the Aylesbury Vale one week late due to equipment issues. Since then, we have lost approximately five days due to poor weather conditions and issues with equipment. As it currently stands, we have completed the first cut and already begun the second cut. 

As we are approximately two weeks behind in the North of the county, we are working at the weekends in an attempt to catch up. By the time we get to the third cut, we will be back on track with the programme. 

In the High Wycombe area, the grass cutting programme is also approximately two weeks behind. 

In South Bucks and Chiltern areas of the county, we are approximately four weeks behind and are just completing cut one. 


You're not strimming after cutting the grass and then you're leaving the cut grass behind!

All strimming around street furniture is completed in conjunction with mowing. However, as the grass has not been cut since last October it can be incredibly long and doesn't always drop once strimmed, giving the impression that it hasn't been cut. 

We have not collected the clippings for many years as to do so adds a large cost to the operation. There are also issues with appropriate disposal of them. Our teams do blow the loose grass cuttings back onto the verge. However, this does mean the loose grass can sometimes make the area look like it hasn't been cut or strimmed. Unfortunately, if the conditions are windy then the grass can blow back onto the footpath or road. 











You've missed my area!

Because of the amount of rain we have had at the moment, the grass has had ideal growing conditions and as a consequence of this, is growing very quickly. This means that sites that have received their first cut early on in the programme may appear as though they have been missed from the programme.


Can I cut the verge outside my house?

In much the same way as we encourage residents to clear the footpaths in the winter if we have snow, there are very few good reasons to prevent a resident living in an urban area with a 30mph speed limit from cutting the verge outside of their property. If you want to cut the grass then:

- Use a petrol mower if possible, if not then make sure your electric mower has a protected plug or is connected to a protected socket

- Make sure there are no big stones that could flick up and break windows, damage cars or hurt yourself or a passing pedestrian

- Stop mowing when somebody comes close

- If you want to collect the clippings then dispose of them responsibly. Leave the last cuts clippings in place, this will help to replenish the soils nutrients. 

The people driving the vehicles are speeding

Our teams are trained to use the equipment that we use and are aware that speeding does cause issues with the quality of the cut produced. 

All of our vehicles are tracked and the speed is monitored. 


You've neglected Iver!

Iver is receiving grass cuts just as often as anywhere else in the county. In fact, Iver was one of the first parishes to be cut in the South of the county! 




Follow us on Twitter | Like us on Facebook

Thursday, 23 May 2019

Respect Our Workforce - Think, keep calm and just turn back.


May has seen the launch of Transport for Buckinghamshire’s (TfB) latest campaign, Respect Our Workforce. Launched with the aim of reminding members of the public to treat operatives, inspectors and technicians on the road with respect, so far the campaign has featured videos and photos from site, discussing some of the abuse that the workforce have to encounter.




Customer facing employees, such as operatives, have been sworn at, shouted at, spat at, had rubbish thrown at them, bottles thrown at them and have even been physically assaulted – all whilst just trying to do their job. In some terrifying instances, operatives have even had members of the public drive through road closures because they don’t want to use the diversion route. By doing this, they are not only putting their own lives at risk, but also the operatives’ lives at risk too.

It’s a rare – and horrific – occasion if this kind of behaviour is experienced in an office based job, or a job with minimal customer engagement. However, for TfB operatives, inspectors and technicians, who meet members of the public regularly, it’s almost a daily occurrence.
We understand that road closures can be frustrating, that temporary signals can be annoying, that being held up at a site where you can’t see any work happening can be the last straw on a bad day, but it’s never an excuse to abuse our workforce.




Deputy Leader and Transport Cabinet Member, Mark Shaw, said:

“They’re here to do a job. They’re here to look after our roads and make sure they’re safe for you to travel on. We’ve now provided bodycams to each of our traffic management people, so if any incidents happen, we can do something about it. Think, keep calm and just turn back.”

It’s hoped that this new campaign will shed some light on the gravity of the situation, and how TfB can work with the public to prevent abuse from happening.

If you’re a social media user, you may have noticed an increase in our communications via Facebook and Twitter. This is to keep the public in the loop as far ahead of works as possible. A lot of anger comes from members of the public not being informed about closures and diversion routes and we want to tackle this. We will also be looking into using additional, more informative signage for closures and diversions.

Don’t forget, you can also double check your routes for the day using tools such as roadworks.org to check for closures, diversions and delays. This can help you to plan accordingly and avoid any frustrations.

Issues on the road are not the fault of our workforce. If you want to speak to them about the work going, please do so with respect and in a civil manner.

We will bring the abuse of our workforce to an end.

Think, keep calm and just turn back.

Monday, 29 April 2019

What are you doing about all the weeds this year?

Ask the Contract Director!

We understand that as members of the public, you probably have a lot of burning questions regarding the roads around Buckinghamshire. Well, we're giving you the opportunity to get your questions answered by Transport for Buckinghamshire's Contract Director!



This is the 10th blog post that we have produced focusing on the questions that you have been asking the most, this week we are looking at:

What are you doing about all the weeds this year?

Buckinghamshire County Council has had to balance revenue budgets over recent years. This has required consideration of numerous competing priorities, including our statutory duty to ensure the highway remains safe and serviceable, and also tackling priorities identified through customer feedback. Because of this, routine weed control (with the exception of noxious weeds) has not been carried out with any kind of regularity over the past four years. 

Unchecked weed growth isn't just unsightly though - it can also lead to accelerated carriageway deterioration and can inhibit the efficient flow of surface water into and through drainage systems. 

In recognition of these longer term effects, TfB has been given an additional £500,000 to spend on routine weed treatment across the county in 2019. 

Routine weed treatment is a  programme of three cycles of routine spraying that will be undertaken across primary footway locations, including hardstandings, kerbs and channels. This equates to 3,408km of kerbline/channel and 3,055km of footway per treatment. 

This spraying will take place in April to combat early season growth, then in June to combat peak season growth and finally in September to combat secondary regrowth. Timings will be adjusted dependent on weather and growth levels. Spraying during high winds and/or heavy rainfall will be avoided as effectiveness is reduced significantly. 

We will be using a chemical that is a non-residual contact herbicide. 

We also have a statutory obligation to control the noxious and injurious weeds on the highway network across the county and this will continue as normal throughout the year. 


Follow us on Twitter | Like us on Facebook 

Wednesday, 17 April 2019

Why are the traffic lights only letting two cars through?

Ask the Contract Director!

We understand that as members of the public, you probably have a lot of burning questions regarding the roads around Buckinghamshire. Well, we're giving you the opportunity to get your questions answered by Transport for Buckinghamshire's Contract Director!

This is the 9th blog post that we have produced focusing on the questions that you have been asking, this week we are looking at:


Why are the traffic lights only letting two cars through?

There are currently over 200 traffic signal sites in Buckinghamshire. These are a mixture of traffic signal controls, from large junctions to pedestrian crossings.

All traffic signals rely on sensors that react to vehicles and pedestrians. Some of these sensors are controlled by their own internal control system, whilst others are coordinated from County Hall in Aylesbury on a centralised system, connected by telephone communications.






Throughout the day the signal timings at each junction are varied according to demand. This allows us to control traffic levels across the county. Whilst this has been done for many years, the systems we use are gradually becoming smarter and more effective, especially at times of high demand. Strategies can be set to bias the timings for a particular route or main road, and coordination is automated to determine the best signal timings for a group of junctions considered together. This can be why you sometimes feel you are being kept waiting at a red signal for no apparent reason! 

For example; If there's a red signal and on the other side of the signal is a queue of traffic, we don't want to allow cars through just to join the queue! This means we might make a red signal last a little longer, and only let through a small number of cars each time, to reduce congestion and help the traffic to flow a little better. When the traffic eases up, we can let more cars through at a time. 

In addition to this, we utilise CCTV to watch the road network for congestion and accidents. When these things occur on the network, we intervene with the signals where necessary, to try to control the traffic building up. 


Follow us on Twitter | Like us on Facebook

Friday, 5 April 2019

Why won't the Watermead bollards stay up?

Ask the Contract Director!

We understand that as members of the public, you probably have a lot of burning questions regarding the roads around Buckinghamshire. Well, we’re giving you the opportunity to get your questions answered by Transport for Buckinghamshire's Contract Director!

This is the 8th blog post that we have produced focusing on the questions that you have been asking, this week we are looking at:


Why won't the Watermead bollards stay up?

Recently, we refurbished some automatic bollards at Lark Vale, Watermead. These bollards create a restricted access route and make sure the route can only be used by buses. Unfortunately since they were installed, the bollards have failed several times. This has happened for a number of reasons and has caused a lot of frustration to the local residents. 

The system that was originally in place for the bollards was outdated, having been in use for over ten years. This meant that maintenance of the bollards became increasingly difficult and so they were becoming very unreliable.

Using our 2018/19 budget, we were able to refurbish the bollards and install new technology for the system to operate on. This new system utilises the use of ground detectors, card readers and card swipe systems. 



The bollards during refurbishing works.



So how does the new system work?

Currently, bus drivers should drive the bus over the ground detector, and get their access pass card detected by the card reader, which is mounted on a pole on the drivers side on the approach. The reader then 'grants' access and the bollards lower into the ground. Once the bus has passed safely through, and the ground detectors are clear, the bollards rise back up.


How are we dealing with the system when it fails?

Aside from the vandalism incident, which caused the system to fail, they would only fail for safety reasons. For example, if a bus drives too close before the bollards are retracted, they will remain lowered. This has happened on several occasions now, and we are working closely with the bus team to make sure drivers are fully trained on how to use the bollards correctly. Each time a bus trips out the bollard system, a member of our team has to attend the site to manually reset the bollards, and we do this as soon as we can. 

However, whilst we originally thought this was the only problem, we have now discovered that the system is occasionally failing for other reasons that are requiring ongoing investigation. As a result, we are working closely with our contractors, ATG, who are currently investigating this as an urgent priority. 

Until we have resolved this issue, we will continue to go and reset the bollards as and when we need to.


What else are we doing?

In addition to looking into how we can rectify this ongoing issue, we are also seeing if we can implement two changes to the bollards - a manual reset button and remote monitoring. 

The manual reset button would mean we could give the Parish Council the ability to reset the bollards themselves. This would mean they could potentially be reset more quickly than having to wait for someone from Transport for Buckinghamshire to attend the site. 

Having remote monitoring would mean that we could raise and lower the bollards from our offices, so we wouldn't have to attend the site and again, the issue could be rectified more quickly. 


We understand resident's frustration with the bollards at Lark Vale and we are aware that it is an ongoing issue. Please be assured that this is a priority and we are working to resolve the problems as soon as we can. 


***EDIT - FURTHER UPDATE***

After some thorough investigation, we have been able to determine that there are issues with the card reader wiring; the wires need to be replaced. This has taken longer to determine than expected because it's an issue to do with the ducting - pipe lines that are carrying the electrical wiring beneath the ground. It is suspected that these have become either damaged or blocked, which is preventing the bollards from working. 

Due to the scale of work required, we are looking at different options that both maximise the effectiveness of the repair as well as being cost efficient. 

Why aren't we leaving the bollards up and resetting them more regularly?

Due to the card reader failing, not only does this cause the bollards to fail, but in most cases this would actually cause the bollards to remain up. This happened at our Fairford Leys site and is not something we want to repeat at Lark Vale, as it would cause more issues - the buses would not be able to get through because the card reader wouldn't work! As a result of this, it has been decided to leave the bollards down until further notice. 

We are currently working with our supply chain partner to get these issues resolved as soon as possible and will continue to share updates as and when we have them. 

We know this situation is frustrating but we thank you for your patience and hope you understand that this isn't straightforward for us to resolve. 



Follow us on Twitter | Like us on Facebook

Tuesday, 26 March 2019

What's going on with the Plane and Patch programme?


Ask the Contract Director!

We understand that as members of the public, you probably have a lot of burning questions regarding the roads around Buckinghamshire. Well, we’re giving you the opportunity to get your questions answered by Transport for Buckinghamshire's Contract Director!

This is the 7th blog post that we have produced focusing on the questions that you have been asking, this week we are looking at:


What’s going on with the Plane and Patch programme?


This year’s Plane and Patch programme commenced on 4th March 2019 and, continuing until September, will cover over 150 separate locations around Buckinghamshire.

As the work goes on, we have been sharing ‘before and after’ pictures of each road undergoing Plane and Patch treatment on our social media channels. Some of the locations that we have shared so far have been roads in more residential areas, and we have been asked why that is.






TfB takes a balanced approach to prioritising which roads to repair, a strategy that we believe provides the best mix of preventative and replacement work across all roads in the County. The majority of the annual capital budget is targeted at ensuring our main roads remain in good condition, with most larger resurfacing and surface treatment schemes taking place on more strategically important roads. 

However, it is very important that we do not allow our main roads to take up our entire budget because many of our more minor roads, which are still important routes for locals, are in poor condition. For this reason, we make sure that some of the budget is spent on all classes of roads.  Plane and Patch work is particularly effective on minor roads, compared to main roads.

The Plane and Patch programme therefore primarily targets these more minor routes and is largely driven and determined by our Local Area Technicians (LAT’s) and Members, who, between them, have a broad knowledge of the roads within their area, particularly those that will benefit most from Plane and Patch treatment.

Do you want to read more about our approach to highways asset management?  See here for more details. 


Follow us on Twitter | Like us on Facebook

Tuesday, 19 March 2019

Why haven't you turned this light back on? - Ask the Contract Director #6



Ask the Contract Director!

We understand that as members of the public, you probably have a lot of burning questions regarding the roads around Buckinghamshire. Well, we’re giving you the opportunity to get your questions answered by Transport for Buckinghamshire’s Contract Director!

In each blog post in this exciting new series, we will be focusing on a different frequently asked question. This week, we’re answering:


Why haven’t you turned this light back on?


Transport for Buckinghamshire looks after over 29,000 streetlights and 6,000 illuminated bollards. Across the county, we rely on thousands of street lights to illuminate the local paths and footways for us when we are out and about.


LED Replacement Programme

Over the course of 2018/19, the Street Lighting Team has been replacing 3,295 of the ‘old style’ lanterns with LED equipment. These old style lanterns cast an orange light, whilst the new lanterns produce a brighter, white light. Approximately 3,000 of these lanterns have been converted and it is expected that this programme will be complete by the end of March 2019.

However a small amount of the old style lanterns will remain for a number of reasons, whilst remedial actions are taken, including a need for the entire column to be changed or the column base being surrounded by privately owned land.

In addition to this, the team has also completely replaced 344 lanterns which were mounted on electricity poles.






Night Scouting

Whilst you can report street lights that are damaged or broken on ‘Fix My Street’, TfB also has a Night Scouting programme. Members of the Street Lighting team check for outages along the strategic routes across the county, making note of lights that need any work doing to them. Six routes are covered over a three month period, and the scouting occurs on a quarterly basis.

However, if you do spot a damaged or broken street light, please do report it using ‘Fix My Street’ (https://www.fixmystreet.buckscc.gov.uk/). Use the search bar to find the road the street light is on, use the marker to pinpoint the area it is in and select the number of the street light that you are reporting. This should be used for faults that do not present an immediate risk, for example, street lights that aren’t working. In an emergency, please call 01296 382416 to report.



Solar powered bollards

Transport for Buckinghamshire’s Street Lighting Team has been working with their manufacturing partners, NAL Ltd and Traffic Management Products (TMP), to begin implementing a new and innovative bollard solution across the county, installing over 100 bollards to date. These new bollards are solar powered and have a number of benefits, including reduced energy costs and no need to connect to underground cables, meaning no issues can be caused by power outages or damaged cables.

Another advantage of these new bollards is that they are also easier to repair – the solar powered bollards use socket mounted equipment. Currently, if a bollard is damaged or broken, it can be complicated to repair or replace them as there is a need for traffic management, or in some cases, road closures. However, if one of the new style bollards is damaged or needs replacing, the equipment can be changed quickly and easily and removes the possibility of live wires being exposed in the event of a road traffic collision.






Sometimes the problem lies with the electricity supplier

Sometimes members of the public report failed lights to us that have stopped working due to an underground electrical supply fault. If this is the case, TfB are not able to repair the fault, because the cables are owned and maintained by the electricity companies for the area. Only they are allowed to carry out repairs to their networks.

TfB works closely with the three electricity companies who have equipment within the county to resolve these issues as and when they’re discovered, but the repairs can take some time and be complex in nature. This is usually why, sometimes, a street light you have reported as being out may be out for some time.



Remember…

Street lights are for lighting public highway and footpaths. Please do not report street lights that are not lighting up privately owned land, for example, gardens and driveways.


Follow us on Twitter | Like us on Facebook